Friday, January 6, 2012

#18 Drainage

Recently, we completed some much needed drainage projects on hole eighteen.  As stated in the previous posts, similar projects will continue through the winter.  The goal is simple, remove surface and subsurface water from areas that remain wet.   Commonly, the best approach is to create a trench, add pipe, gravel, catch basins(if needed), regrade and sod. 
Garrett Neville and Fred Philipp trench near #18 approach

A catch basin is added to collect surface water.

The catch basin installed.

Drainage on the 2nd fairway on hole 18.

No comments:

Post a Comment